Green Vikalp
HomeProjectsSolutionsServicesAbout UsBlogs
Get Free Site Assessment

Services

Biogas Plant Installation & Sustainable Waste Solutions

Green Vikalp delivers comprehensive biogas plant execution, O&M, waste management and organic fertilizer production with a focus on performance, compliance, and measurable financial returns.

Industrial biogas plant installation

What we offer

Complete services for biogas plant lifecycle success

Biogas Plant Installation

Biogas Plant Installation

End-to-end biogas plant setup designed for industrial, commercial, and residential waste streams.

  • Site assessment & feedstock audit
  • Custom engineering and civil execution
  • Plant commissioning with safety and performance validation
Operation & Maintenance

Operation & Maintenance

Regular plant care, performance optimization, and emergency support to keep systems running reliably.

  • Routine biological and mechanical checks
  • Methane recovery and gas purity monitoring
  • Remote analytics and rapid service response
Organic Fertilizer Production

Organic Fertilizer Production

Turn waste digestate into high-value organic fertilizer for agriculture and landscaping.

  • High-nutrient composting and curing
  • Pathogen control and odour-safe handling
  • Bulk packaging and value-add product support

Waste Management Solutions

Integrated handling of food, agriculture, industrial and municipal organics for cleaner, safer site operations.

Business & Investment Consulting

Financial modeling, subsidy strategy, and project financing support for renewable energy projects.

CBG Technology

Advanced purification and compression systems to convert raw biogas into high-quality fuel-grade CBG.

Why choose Green Vikalp

Trusted execution for plant performance, compliance, and ROI

We blend engineering, process science, and operational support so your plant delivers clean energy, organic fertilizer, and project certainty from day one.

Renewable Fuel Production

Convert organic waste into clean energy and transport-grade Bio-CNG for long-term savings.

Reduced Waste Costs

Lower disposal expenses and reduce greenhouse gas emissions with sustainable processing.

High Reliability

Our systems are built for durable operation and designed for minimal downtime.

Project support

End-to-end guidance at every stage

From feasibility and DPR preparation to installation, subsidy alignment, and ongoing operations, our team stays engaged to secure measurable outcomes.

  • Free site audit for fit-for-purpose plant design
  • Government subsidy and compliance support
  • Turnkey execution from civil work to commissioning

Project estimate

CBG plant size recommendations

3 TPD

Ideal for small farms and hospitality waste streams

6 TPD

Balanced capacity for medium industry and agriculture

12 TPD

Higher volume systems for large complexes and clusters

Upgradable

Modular design allows phased expansion with low disruption

Contact us

Start your biogas plant project with a technical feasibility review

Speak with our team to assess feedstock, project economics, site requirements, and available support for a CBG or biogas plant in your region.

Reach us

Phone
+91 92201 60390
+91 8796999596
Email
info@greenvikalpllp.com
Follow Green Vikalp on LinkedIn, Instagram, Facebook, and YouTube via the site footer below.
Biogas plant operators inspecting a new facility

Frequently asked questions

FAQs for Biogas Plant Installation and CBG Projects

Answers to the most common questions around project eligibility, technology, timelines, operation, and financial support.

What is a biogas plant and how does it work?

A biogas plant converts organic waste into methane-rich gas through anaerobic digestion. Green Vikalp designs plants that take food, agricultural, and industrial organics, then recover energy, fertilizer and process water from the same system.

Which waste materials can be used for biogas and CBG production?

Our systems are optimized for cattle dung, agricultural residues, food waste, distillery spent wash, and press mud. These feedstocks are commonly used in India and can be blended for stable digestion and higher methane yield.

Can biogas be upgraded to Bio-CNG for vehicles and industrial use?

Yes. We offer biogas purification and compression systems that produce high-purity CBG suitable for transport fuel, industrial burners, or grid-quality energy applications.

How long does it take to install a biogas plant?

Typical project timelines range from 6 to 9 months, including site assessment, civil work, equipment installation, and commissioning. Actual delivery depends on site readiness, local approvals, and project scale.

What subsidies and financial incentives are available for a CBG or biogas plant?

Biogas and CBG projects in India may qualify for MNRE central-government support, plus state incentives. Green Vikalp helps document eligibility, prepare subsidy applications, and align project costs with approved frameworks.

What maintenance is required after installation?

Regular maintenance includes monitoring digester biology, checking pumps and valves, cleaning filters, and calibrating gas upgrading systems. Our O&M services ensure reliable performance and minimize downtime.

How much organic fertilizer can the plant generate?

Biogas plants produce nutrient-rich digestate that is processed into organic fertilizer. Output depends on feedstock volume, but most plants deliver fertilizer that can be used onsite or sold to farmers.

Is a biogas plant suitable for my industry or farm?

We evaluate your waste profile, energy needs, and site conditions. Ideal clients include farms, food processors, distilleries, hotels, municipalities, and industrial complexes with steady organic waste supply.